EM31 CMD Electromagnetic Conductivity

EM31 CMD Electromagnetic Conductivity

Detecting anything from fine, shallow details to larger structures hidden far below.

These tools map geological variations, groundwater contaminants or other sub-surface features associated with ground conductivity; using an electro-magnetic inductive technique that makes the measurements without electrodes or ground contact. 

Typical features which can be located are: 

  • Mine shafts, coal shafts and buried wells 
  • Old foundations/ building lines, footings and pile caps 
  • Basements & cellars 
  • Tunnels, cavities, sink holes and underground voids, 
  • Dissolution features 
  • Buried tanks & other structures 
  • Bedrock and ground water  

Want to know more about EM31 CMD?

The EM31 has a depth penetration of 6m below the ground surface, whilst the CMD Explorer can achieve 3x different depth penetration thresholds; up to 2.3m, up to 4.2m and up to 6.7m respectively (subject to site conditions).  

The equipment is designed to precisely detect small changes in the sub-surface conductivity and has proven a useful tool for the detection of buried metallic structure and waste, as well as mineshafts or wells.  

Disadvantages are that the data collected is adversely affected by the presence of metallic objects, whilst it is not possible to apply a depth to any anomalous areas highlighted. 

Both tools are particularly good at achieving data collection across larger areas over a shorter time frame than other methods.  

Below are some example survey results illustrating what the equipment can achieve. 

An EM31 CMD survey is an electromagnetic geophysical survey carried out using an EM31 or CMD instrument. Both use a boom configuration to identify variations in ground conductivity.

GEOTEC surveyor carrying CMD electromagnetic conductivity equipment across a field

GEOTEC predominantly uses EM31 and CMD surveys to detect evidence of tunnels, cavities, mineshafts and dissolution features.

The EM31 can penetrate to a depth of approximately 6m below the ground surface.

The CMD Explorer has three depth thresholds and provides three sets of data: shallow (2.3m), mid-range (4.2m) and deep (6.7m).

Because the instrument provides three datasets, each can be reviewed in isolation to help identify and reduce noise caused by interference or metal.

An EM31 CMD survey may be suitable when you need to locate or investigate something beneath the ground without excavation. GEOTEC will assess the target and site conditions to determine whether this or another geophysical survey method is most appropriate.

The CMD provides three different depth readings and therefore three times as much data, helping to reduce the impact of noise within the results.

Another benefit is the ability to survey a large area in a relatively short period of time.

This technique is most effective where there is no metallic interference or physical obstruction. Metal and obstructions can reduce the ability to collect reliable data across the full survey area.

Although the boom is approximately 4m long, data must be collected at consistent 1m or 2m intervals without gaps. Each pass forms part of the wider dataset, so even a small area of interference can affect the overall results.

Underground
Mapping

An example of a survey where we have several unidentified ground penetrating radar targets present, as well as confirmed buried services and utilities.

This tool also allows us to confirm the presence of metallic and conductive services that have already been detected through radio frequency detection / electro-magnetic locating (RFD / EML).

GPR Surveys

ERT / Resistivity

What's going on?

INDUSTRY NEWS

Top Marks for GEOTEC in UVDB 2026 Audit

20/09/2026

GEOTEC Kit Out Orangefield Juniors first All Girls Team

10/02/2026

ISO9001:2015 Quality Surveillance Audit Complete

20/01/2026

GEOTEC are now on SafeContractor

02/11/2025

GEOTEC achieve 100% Achilles UVDB Audit Score

07/09/2025

HSE release work-related accident records

03/07/2025

Railway Audit Success

02/07/2025

Collapsed Culvert creates Sinkhole

12/12/2024

Churchill Way Canal Scheme Wins Major Award

28/10/2024

BBC’s Repair Shop helps GEOTEC Client Selsey Pavilion Theatre

07/10/2024

GEOTEC Sponsor Orangefield OB Juniors

19/09/2024

GEOTEC Surveys 100% Achilles UVDB Audit for 2nd year running

02/09/2024